# Gas safety, EPC and tenancy paperwork in Northern Ireland

> Northern Ireland landlords: the 12-month gas safety check, EPC rules with the £200 penalty and no minimum rating, and the 28-day Tenancy Information Notice.

Northern Ireland landlords need an annual gas safety check, an EPC when marketing a property, and a Tenancy Information Notice within 28 days of a tenancy starting [[1]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-1)[[2]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-2)[[3]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-3).

## What is the gas safety rule?

Check each appliance and flue at intervals of no more than 12 months and keep the record. Give each existing tenant a copy within 28 days of the check and give new tenants the last record before they move in [[1]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-1). These are the rules in force today. SR 2026/178 is a proposed statutory rule (negative resolution) laid on 13 October 2026, whose statutory period ends on 24 November 2026; it is not made [[4]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-4). HSENI's consultation on it proposed more flexibility in the timing of a landlord's annual check (regulation 36(3) and a new regulation 36A) [[4]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-4). Until it is made, the rules above apply: check with [HSENI](https://www.hseni.gov.uk/) for changes.

## Is an EPC required, and is there a minimum rating?

You need a valid EPC when you market a property for rent. It lasts 10 years and district councils enforce the rule [[2]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-2). The penalty charge for a dwelling is £200 [[5]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-5). There is no minimum EPC rating for private lets at present; the 2022 Act only gives the Department power to make energy efficiency regulations [[6]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-6).

## What is the Tenancy Information Notice?

A free notice with rent, rights and responsibilities, given within 28 days of the tenancy starting. If the information changes, give a Notice of Variation [[3]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-3).

## Do I need to give receipts?

Landlords or agents must give a written receipt for any cash payment linked to the tenancy. The tenant has a right to receipts for payments made in cash [[3]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-3).

## Worked example: a tenancy starting 1 December 2026

The gas check and EPC were both done on 15 November 2026. The next gas check is due by 14 November 2027, within 12 months [[1]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-1). The EPC lasts 10 years and runs to 14 November 2036 [[2]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-2). The Tenancy Information Notice, a free notice, is due within 28 days after the tenancy is granted: by 29 December 2026 [[3]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-3)[[7]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-7).

The new tenant gets the last gas record before moving in; an existing tenant gets a copy within 28 days of each check [[1]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-1). The penalty charge for a dwelling under the EPC regulations is £200 [[5]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-5).

## Common mistakes

- Assuming the proposed gas amendment is law. SR 2026/178 is not made and the statutory period ends on 24 November 2026; until it is made, the 12-month rule applies [[4]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-4).
- Believing a minimum EPC rating applies. None does for private lets at present [[6]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-6).
- Treating the Tenancy Information Notice as optional. It is due within 28 days [[3]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-3).
- Not giving receipts for cash payments. A written receipt is required for any cash payment linked to the tenancy [[3]](https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/#src-3).
- Letting the gas record lapse because the engineer 'will be round soon'.

## What to do next

- Enter the gas, EPC and notice dates in the [compliance calendar](https://landlorddeadlines.co.uk/northern-ireland/compliance-calendar/).
- Recheck HSENI after 24 November 2026 for the outcome of the proposed gas amendment check with [HSENI](https://www.hseni.gov.uk/).
- Do the deposit paperwork on the same day: [deposits](https://landlorddeadlines.co.uk/northern-ireland/deposits/).
- Add the [EICR](https://landlorddeadlines.co.uk/northern-ireland/electrical-safety-eicr/) if it is due.

## Sources

1. [Gas Safety (Installation and Use) Regulations (Northern Ireland) 2004, regulation 36](https://www.legislation.gov.uk/nisr/2004/63/regulation/36)
2. [nidirect: energy performance certificates](https://www.nidirect.gov.uk/articles/energy-performance-certificates)
3. [nidirect: private tenancies, landlord and tenant guide](https://www.nidirect.gov.uk/node/1228)
4. [NI Assembly: Gas Safety (Installation and Use) (Amendment) Regulations (NI) 2026 (SR 2026/178), status](https://www.niassembly.gov.uk/assembly-business/committees/2022-2027/economy/legislation/delegated-legislation/2026/the-gas-safety-installation-and-use-amendment-regulations--northern-ireland-2026/)
5. [Energy Performance of Buildings (Certificates and Inspections) Regulations (NI) 2008, regulation 35](https://www.legislation.gov.uk/nisr/2008/170/regulation/35)
6. [Private Tenancies Act (Northern Ireland) 2022, section 9 (energy efficiency regulations)](https://www.legislation.gov.uk/nia/2022/20/section/9)
7. [Private Tenancies Act (Northern Ireland) 2022, section 1 (Tenancy Information Notice)](https://www.legislation.gov.uk/nia/2022/20/section/1)

Last checked: 22 November 2026. General information, not legal or tax advice. Checked against nidirect, the Department for Communities and legislation.gov.uk. Rules change: always confirm at the source.

## Common questions

### How often is a gas safety check needed in Northern Ireland?

At intervals of no more than 12 months.

### Is there a minimum EPC rating for rentals in Northern Ireland?

No minimum rating applies to private lets at present. An EPC is needed when marketing, with a £200 penalty charge for a dwelling.

### Is the proposed gas amendment in force?

No. SR 2026/178 was laid on 13 October 2026 and is not made; the 12-month check applies.

### Is a Tenancy Information Notice free?

Yes. It is a free notice given within 28 days of the tenancy starting.

## Related tools and guides

- [Smoke, heat and CO alarms](https://landlorddeadlines.co.uk/northern-ireland/smoke-heat-co-alarms/)
- [Electrical safety (EICR)](https://landlorddeadlines.co.uk/northern-ireland/electrical-safety-eicr/)
- [Tenancy deposits](https://landlorddeadlines.co.uk/northern-ireland/deposits/)

Last updated: 22 November 2026. How we source and check pages: [editorial policy](https://landlorddeadlines.co.uk/editorial-policy/). Spotted a mistake? [Tell us](https://landlorddeadlines.co.uk/contact/).

---
Source page: https://landlorddeadlines.co.uk/northern-ireland/gas-epc-and-repairs/
Independent guidance for landlords in England, Scotland, Wales and Northern Ireland. Contains public sector information licensed under the Open Government Licence v3.0. Not affiliated with GOV.UK, HMRC or MHCLG.
